Zenner SINGLE-JET METERS Instrukcja Użytkownika Strona 3

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 2
4
General notes
Watermeters are precision instruments. Protect
against shock and vibration. Storage under cool, dry
and frost free conditions.
Thesealingsurfacesareequippedwiththreadpro-
tectioncaps,andthusprotectedfromdamage.
Check and ensure before beginning the installation:
Thatthesealingfacesareatandfreefromda-
mage such as notches, grooves, etc..
Thatallindicationsonthedialarereadble*.
Themetertsintype,size,temperatureandpres-
sureratingtotheinstallationandmeteringpoint.
Withpollutedorloadedwaterwerecommend that
lters or strainers in the inlet must be installed
upstreamofthemeter.
Themetershouldalwaysbeinstalledatthelowest
possiblepointofthepipingaswellasfrostprotec-
ted,to preventthe accumulationof air anddama-
ges.
Thewatermetermustbeinstalledintothepipeline
free of any of mechanical forces or tensions.
Watermeters must be operating completely lled
with water - for wet dial meters this includes also
thecounter!
Themetermustbeprotectedwithappropriatemea-
suresagainstpressureshocksinthepipeline.
Whenthereisdangeroffrost,emptycompletelyand
shutofftheinstallation(includingthemeter),ifne-
cessary, dismount the meter.
Themetermustalwaysbeeasilyaccessibleandle-
gible, including all indications on the dial.
We recommend that the installation points on the
pipelineshouldbesecuredwithasealagainstunau-
thorizeddismounting.Thesealshouldnotberemo-
vableorloosenedwithoutvisibledamage.
Theinstallationhastobedonebyqualiprofessi-
onal personnel. We would refer to the applicable
rulesoftheDINISO4064:2015,Part5.
Installation:
1. Readtheseinstructionscarefullyrightuptothe
end!
2. Closevalvesupstreamanddownstreamofthe
meter.
3. Releasepressureattheinstallationpoint.
4. Dismount existing meters or meter blanks.
5. Useonlynewandawlesssealingmaterial.
6. Check the seal face for damage.
7. Install the new meter according to the correct
owdirection and installation position. Ensure
that the sealing joints do not fall out, or are being
damaged.
8. Screwtheconnectionnutsandtightenthem.
9. Openvalescarefullyandavoidpressureshocks,
purgeadequately.
10. Checkinstallationforleakage.Thedialandthe
indications regarding the conformity /metrology
must be visible and readable at any time.
Additional instructions for installation of plas-
tic meter:
In order to guarantee a stress-free installation,
werecommendtheuseofawatermeterinstalla-
tionbracket(WZAG).
Recommended tightening torque for the connec-
tors:min.20Nmuptomax.30Nm.
Declaration of conformity
ZENNERInternationalGmbH&Co.KG
declaresthattheproductwiththenumberof
oneoftheECtype-examinationcerticates
DE-06-MI001-PTB005,DE-06-MI001-PTB006,
DE-07-MI001-PTB009,DE-08-MI001-PTB016,
DE-08-MI001-PTB017,DE-07-MI001-PTB010,
DE-13-MI001-PTB001,DE-15-MI001-PTB004,
CH-MI001-10040 or CH-MI001-14062 com-
plieswiththeessentialrequirementsoftheEC
directive 2004/22/EC (Measuring instruments
directive).
ZENNERInternationalGmbH&Co.KGherebyde-
clares that the product for Remote Metering with
theapplicationWirelessCommunicationscomplies
withtheessentialrequirementsoftheECdirective
1999/5/CE(R&TTE).
Themostup-to-dateinformationaboutthisproduct
can be found at www.zenner.com
English
*Dataregardingtheowratesaredependingontherespectivenominalsize.
Przeglądanie stron 2
1 2 3 4 5 6 7 8

Komentarze do niniejszej Instrukcji

Brak uwag